The development is located on a very steep site and consists of consists of 2 basement levels (car parks), ground floor level (industrial), level 1 and 2 (office) and external works. It has involved a mixture of construction methods including:
This project has required RMA to manage the coordination of a
number of different design and construct contractors. Structural design completed by RMA.